Liverpool Civic Place

Client:

Built

Completed:

 Work in Progress

Duration:

 

SCOPE OF WORKS
  • New Main switchboard and distribution boards (tenancy and house)
  • Energy metering to meet Section J of NCC 2019 with separate EMS system
  • Submains Cabling
  • Authority metering
  • Underground pits and conduit systems
  • Earthing Installation
  • Photovoltaic Install, complete and functional put into service connected to building electrical system as shown on the electrical single line diagram
  • Internal and External lighting
  • Emergency evacuation lighting and exit signages
  • Lighting installation including lighting control system
  • Cable supports systems
  • Generator system as per PCA A grade requirement complete with fuel tanks, pumps, initial fuel fill, controls etc. put into service ready for operation of building
  • Structured cabling systems (CAT 6A) and fibre
  • Provision for power supply to building signage with metering
  • Electromagnetic shielding
  • DAS and GRN system
  • Lightning protection system compliant to AS1768