Client:
Built
Completed:
Work in Progress
Duration:
SCOPE OF WORKS
- New Main switchboard and distribution boards (tenancy and house)
- Energy metering to meet Section J of NCC 2019 with separate EMS system
- Submains Cabling
- Authority metering
- Underground pits and conduit systems
- Earthing Installation
- Photovoltaic Install, complete and functional put into service connected to building electrical system as shown on the electrical single line diagram
- Internal and External lighting
- Emergency evacuation lighting and exit signages
- Lighting installation including lighting control system
- Cable supports systems
- Generator system as per PCA A grade requirement complete with fuel tanks, pumps, initial fuel fill, controls etc. put into service ready for operation of building
- Structured cabling systems (CAT 6A) and fibre
- Provision for power supply to building signage with metering
- Electromagnetic shielding
- DAS and GRN system
- Lightning protection system compliant to AS1768