Macquarie Exchange Building D (MQX4)

Client:

Roberts Co

Completed:

Work in Progress

Duration:

 

SCOPE OF WORKS
  • Consumer Mains
  • Main Switchboards (MSB)
  • EMF Shielding including EMF Study (by EMF Consultant engaged by Electrical Contractor)
  • Power Factor Correction
  • Stand-by diesel generator system and associated fuel tank
  • Spatial provisions for a future tenant stand-by diesel generator system
  • Power Management and Control System
  • Uninterruptable Power Supply (UPS)
  • Supply Authority Metering
  • Embedded Energy Metering
  • Electrical energy metering
  • Distribution Boards
  • Submain Cabling
  • Final Sub-Circuit Cabling
  • Cable Containment Systems
  • General Power and Power to Other Services
  • Soft wiring system
  • Floor boxes and Table Boxes
  • Electric Vehicle (EV) Charging System
  • Photovoltaic System Connections (PV system to be designed and installed by others)
  • Earthing and Bonding System
  • Lightning Protection System and surge protection
  • Lighting (Internal and External)
  • Lighting Control System
  • Emergency Lighting and Exit Signs
  • Lead-in Communication Cabling Pathways
  • Fibre To The Premises (FTTP) Infrastructure (NBN)
  • Integrated Communication Network (ICN) Infrastructure
  • Base Building Communications Network
  • Television Distribution System (MATV and Pay TV)
  • In Building Coverage (IBC) system: Hybrid Distributed Antenna System (DAS)
  • FM & Security 2 Way Radio System
  • Integrated Security Management System
  • Electronic Access Control (EACS)
  • Intruder Alarm System (IAS)
  • Duress System
  • Intercom system
  • CCTV system
  • Environmentally Sustainable Design (ESD) Requirements
Scroll to Top